New Step by Step Map For Cast in Situ Piles
The 25mm thick large metal tube is driven with the conclude closed by a metal shoe. On reaching the essential driving resistance, a complete length cage is decreased in into the tube and stuffed with superior slump concrete. The tube is then vibrated out leaving a shaft of concrete.Demolition of the surplus concrete previously mentioned the Reduce-